Location: Cory Riverside Energy Park, Belvedere, Kent.
Project Type: Engineering/Project Support
Sector: Industrial
Cory Riverside Energy Park is an Energy from Waste plant (EfW) situated in Belvedere Kent, the facility is one of the largest operational EfW facilities in the UK.
Cory’s Riverside facility is one of the largest operational EfW facilities in the UK, and the only one with both river and road infrastructure for receiving waste.
A by-product of the combustion process is steam. This steam is used to drive a turbine in the EfW facility that can produce partly renewable base load electricity to power the equivalent of 160,000 homes.
We provide our services in the following areas to ensure the smooth operation of the business.
Plant and equipment upgrade support, inc the recent water treatment plant extension.
Provide ongoing engineering support as required.
“I have thoroughly enjoyed my time as an Offshore Site Technician working for Protec Engineering Services at Rampion Offshore Windfarm. Protec is a great company to work for and very supportive, they really looked after us in what has been a very difficult year for many people. Despite a curtailment to the work pattern to maintain separation of different shifts they still gave us a generous salary package which provided peace of mind in uncertain times. I wouldn't hesitate to recommend them as an employer.” Hugh Waddicor – Authorised Wind Turbine Technician
Protec Engineering Services
Protec Engineering Services © | Email Us | Website by David Jenner
Protect Engineering Services Ltd is registered in England & Wales No: 05315699
We use cookies to improve your browsing experience on our site and they do not contain any personal information. By clicking the Accept button you consent to our use of cookies.